SOLAR PARK

The Advantages

Our Solar Parks would include all required facilities for generation of solar power, which include  land, evacuation and transmission infrastructure, solar radiation monitoring station, water availability, access roads to the park, interior roads in the park, telecommunication facility, fire station, green belt and security. Other elements of the solar park could be manufacturing facilities, testing and characterization facilities, R&D and demonstration in accordance with the State policy.

Large size projects have a potential to bring down the cost of Solar Power. Solar Parks each having capacity of 50 to 500 MW or above have been planned across India.

What we offer

  1. Develop, plan, execute, implement, finance, operate and maintain the Solar Power Park
  2. Identify potential site and to acquire/possess land at potential sites for Solar Power Park
  3. Carry out site related studies/investigations
  4. Obtain statutory & non statutory clearances and to make area development plan within Solar Power Park.
  5. Design a plan for sharing development cost between the developers and the park
  6. Create necessary infrastructure like water, transmission lines, roads, drainage etc. to facilitate Solar Power Project developer for faster implementation of Solar Power Projects
  7. Frame out transparent plot allotment policy and specify procedures pursuant to the relevant State policies and their amendments thereof.
  8. Provide directives for technology-specific land requirements
  9. Engage the services of national/global experts/consultants to promote Solar Power Park related activities
  10. Facilitate the State Government to establish educational institutions/training facilities within Solar Power Park for development of manpower skill related to Solar Power
  11. Any other activities related to Solar Power Park as per the directives from MNRE and the State Government.
  12. Conduct the necessary evaluation and pre-permitting of the environmental and social impacts of utility scale solar deployment before allocating the land to prospective developers
  13. Acquiring the land for the Park, cleaning it, levelling it and allocating the plots for individual projects.
  14. Obtaining land approval for installation of solar power plants and necessary permissions including change of land use etc.
  15. Road connectivity to each plot of land
  16. Water availability for construction as well as running of power plants and demineralization plant
  17. Flood mitigation measures like flood discharge, internal drainage etc,
  18. Construction Power and Telecommunication facilities.
  19. Transmission facility consisting pooling station (with 400/220, 220/110 kV switchyard and respective transformers) to allow connection of individual projects with pooling station through a network of underground cables or overhead lines.
  20. Housing facility for basic manpower wherever possible
  21. Parking, Warehouse etc.
  22. The Park will provide road access (both approach roads and smaller access roads to individual plots), water (via a dedicated reservoir located within the premises), boundary fence and security,